Sangwon Cement Complex Fulfills Its National Economic Plan for July
Pyongyang, August 1 (KCNA) -- The workers of the Sangwon Cement Complex have fulfilled their national economic plan for July.
The central control room has increased the production capacity of equipment per hour with a rational operation method suited to the size of raw materials and the condition of crushers and controlled the temperature of kiln in a responsible way and thus boosted production per shift every day.
The calcinating shop has secured materials and accessories and made technical innovations to raise the operation rate of kiln and cooler, while ensuring proper maintenance and repair of equipment.
The combined raw material shop overfulfilled its daily plan by measuring the temperature rise according to the characteristics of heat equipment in real time and introducing efficient cooling methods. And the cement shop has increased the output by improving the capacity of the crushers while mixing the additives in a scientific and technological way. -0-


